Gledswood Hills Building
Inspections

What a Camden handover list looks like

Room by room, and one item that is not about paint at all.

Gledswood Hills 2557 · 25 August 2026

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: The shape of a practical completion list from an Oran Park job four kilometres away.

Painting, recorded room by room

Common areas, master bedroom, bathrooms, ensuites, toilets, the powder room and the ground floor were each recorded separately. That is not padding; it is how a builder's trades are actually dispatched.

The stairs

Balustrades left unpainted, and masking tape still attached to them at practical completion. Tape on a handrail is evidence the painter never came back to that element.

Glazing and joinery

Mirrors marked, a window frame damaged, a laundry trough marked, a splashback recorded. Small items, cheap now, awkward after settlement.

The building items

Caulking outstanding at wall, eave, door and window joints. Pipe penetrations through the external wall unsealed. Grading still required around the house. These are envelope items, not finish.

The one that matters most

The termite management notice not installed. It is required under AS 3660 and it is the only record of what protects the house from termites.

Written by our local inspection team from work carried out in Gledswood Hills. Licensed building practitioners.

Guides

More pci / handover guides for Gledswood Hills

All guides →

Book a building inspection in Gledswood Hills

Instant online pricing for Gledswood Hills, or contact the booking team.

FAQ

Questions Gledswood Hills owners ask about this

Why separate painting by room?

Because that is how it gets fixed. A list that says painting throughout gets one visit; a list that names seven areas gets seven checks.

Which items should I hold the line on?

The envelope ones: caulking, unsealed penetrations, grading, and the termite notice. The painting will get done.

When should I book?

Two to three weeks before your handover date, so there is a window for the builder to act and for us to verify.

Get a Free Quote