Waterproofing inspection in Gledswood Hills

The membrane examined while it is still a membrane.

  • After the membrane is applied and before any tile is laid
  • About 1 hour on site
  • Report within 24 hours
Price your Gledswood Hills inspectionSend the address and the stage you are at.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane is applied and before any tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Gledswood Hills waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Gledswood Hills builds

Wet area rectification is the most expensive defect category in a new home, because correcting it after tiling means taking the room apart to reach a layer that costs a few hundred dollars to lay properly. The photographs on this page were taken in Oran Park, about four kilometres north west and under the same council. Gledswood Hills has booked us for frame work rather than this stage, and captioning another suburb's photographs honestly seemed better than implying a local library we do not have.

What we find at this stage in Gledswood Hills

  • Coverage short at walls and terminations
  • Junctions and penetrations not sealed
  • Falls not carrying water to the waste
  • Membrane damaged before tiling
  • Sealing left incomplete at the splashback and screen
Powder room finish, Oran Park, Gledswood Hills
Powder room finish, Oran Park
Sample findings

Sample defects found during our waterproofing inspections in Gledswood Hills

Annotated findings from Waterproofing inspections on Gledswood Hills builds. Client addresses withheld.

Splashback, recorded during a handover inspection in Oran Park
Splashback detail, Oran Park
Bathroom painting, recorded during a handover inspection in Oran Park
Bathroom finish recorded, Oran Park
Ensuite painting, recorded during a handover inspection in Oran Park
Ensuite finish recorded, Oran Park
Toilet painting, recorded during a handover inspection in Oran Park
Toilet finish recorded, Oran Park

The other stages of a Gledswood Hills build

  1. Bored piers inspection in Gledswood Hills1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Gledswood Hills2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Gledswood Hills3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Gledswood Hills4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Gledswood Hills5FixingAfter mouldings, doors and joinery, before the painter
  6. Pre-handover (PCI) inspection in Gledswood Hills7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Gledswood Hills →

Guides

Construction stage guides for Gledswood Hills

All guides →

Book a waterproofing inspection in Gledswood Hills

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Gledswood Hills: common questions

Which standard applies?

AS 3740 for domestic wet areas, alongside the National Construction Code and the ABCB Housing Provisions.

Do you flood test?

No. A flood test cuts into the waterproofer's own process and their warranty, and it belongs to them.

How long is the window?

Often two or three days between the membrane curing and the tiler starting, which is why the booking needs to be made early.

How does a failure show up later?

A damp skirting or a stain on the wall of the room next door, usually a year or two after you move in and always behind finished tiling.

What happens if the tiler has already begun?

We assess what is still exposed and record the areas already covered.

Who fixes it?

The builder does, coordinating the waterproofer with the tiler. The report gives them the location and the clause rather than an opinion.