Roof on, brickwork up, services in, and the last look before the linings.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Lock-up is the second look at everything the frame inspection listed and the only look at what has been added since. The Oran Park frame records behind this page include wall junctions not nailed off, slotted brackets not installed and truss boots missing, all of which are connections a lining hides permanently.

Annotated findings from Lock-up (pre-plaster) inspections.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Gledswood Hills, or contact the booking team.
It fixes a non load bearing wall to the structure above while letting the roof move as it loads and unloads. Without it the wall either takes load it was never sized for or is not fixed at all.
A connector tying the truss to what supports it. Missing, the truss relies on nails alone for a connection that was designed for a bracket.
Yes, two names for one window, defined by services being in and linings not being up.
About two hours, plus the report the same day.
We assess what is still exposed and record which areas were already closed, so at least you know what could not be seen.
If you can, yes. Lock-up is where the frame list gets closed out, and an unclosed frame item is one that stays hidden for the life of the house.