Building Dispute Practitioners Society The slab carries everything above it and its engineering lives in beam geometry, reinforcement and cover, none of which can be seen once concrete is placed. On the Oran Park job behind these photographs the vapour barrier was recorded with sections missing, which is the clearest possible example of a pre-pour item: trivial to fix on the day, impossible to reach afterwards.

Annotated findings from Slab pre-pour inspections.




1Bored piersAfter boring and cage placement, before concrete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Gledswood Hills, or contact the booking team.
It stops ground moisture rising into the slab and the floor above it. A section missing is a hole in a barrier that was specified as continuous, and it is under concrete an hour later.
Only the surface. Cover, steel, beam sizes and the barrier all stop being verifiable the moment the concrete goes down.
We move with it and there is no charge for the change.
An hour to ninety minutes on a standard lot, with the report out that evening because the pour is the next morning.
Yes. Moving a waste before the pour takes minutes; moving it afterwards means cutting the slab.
Your lot engineering, and the soil report it was drawn from.