Building Dispute Practitioners Society Fixing stage catches the carpentry before paint fills and hides it. On the Oran Park handover behind these photographs the fixing stage items had survived to completion: balustrades unpainted with masking tape still attached, mirrors and glazing marked, a window frame damaged and external render still to be finished. Every one of those is a fixing stage item found three months too late.


Annotated findings from Fixing inspections.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Gledswood Hills, or contact the booking team.
Because paint fills gaps and covers damage, and once it has, arguing that a mark was there beforehand becomes your word against the builder's.
It is evidence rather than a defect. Tape still on a handrail at handover means the painter never returned to that element, which is worth knowing before you sign.
The Guide to Standards and Tolerances 2017 sets the figures used in New South Wales, and the report cites the clause rather than describing the gap.
Between two and three hours on most houses here.
They often run together, though they answer different questions and are reported separately.
The contract and the selections schedule, so the installed work can be read against what you signed for.