Depth, diameter and cage, confirmed while the bore is still open.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Piers appear on Gledswood Hills lots where the footing has to reach through fill or find competent ground below it, which on a suburb built out of former farmland across a ridge is not unusual. Depth is the whole point of the visit and concrete ends any chance of confirming it.

Annotated findings from Bored piers inspections.




2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Gledswood Hills, or contact the booking team.
Under an hour on a typical lot, longer where the pier count is high or the bores are spread across a sloping site.
The measured depth is written beside the required depth. What follows is between your builder and their engineer, and the report gives them the figure to work from.
No. We record against the engineering. Certification is an engineer's function and the report says when one is required.
Concrete placed into water is weakened where it matters most, at the bottom of the pier. Writing it down is what gets it pumped out before concrete arrives.
It follows the lot rather than the council. Your soil report and engineering decide whether piers are used at all.
The engineering for your lot, with pier depths, diameters and positions marked.