Tie down and bracing in Gledswood Hills NSW

A house resists wind uplift through a continuous run of fixings from the roof, down through the frame, into the slab. Each connection is sized for a load and each one is specified in the bracing and tie down schedule that comes with your engineering. What our Gledswood Hills frame inspection recorded was that chain with pieces missing: a bracing tie down bolt absent, a metal angle brace never tensioned, a hoop strap laid over the plate rather than wrapped around it, in three separate places. None of those items costs much. All of them stop being visible the day the plasterer starts.

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

The tie down chain runs continuously from roof to slab.

A bracing tie down bolt was recorded missing on a Gledswood Hills frame.

A metal angle brace was recorded untensioned, which means it does nothing until the wall moves.

Hoop straps over the plate were recorded three separate times.

Bottom plate tie down spacing, at 1200 mm maximum, was recorded on the Oran Park frame nearby.

More about Gledswood Hills

Written by our local inspection team from work carried out in Gledswood Hills. Licensed building practitioners.

Guides

Guides for Gledswood Hills owners and buyers

All guides →

Book a building inspection in Gledswood Hills

Instant online pricing for Gledswood Hills, or contact the booking team.

FAQ

Tie down and bracing in Gledswood Hills NSW: common questions

How would I check this myself?

You can count bolts against the schedule if you have it, and you can see whether a strap is slack. Reading a hoop strap's position against what it is meant to wrap is harder without knowing the detail.

Does a missing bolt matter if the rest are there?

Yes. The schedule specifies a spacing because the load is shared. Remove one and the neighbouring connections carry more than they were sized for.

When is it too late?

Once the wall is lined. After that, verifying tie down means opening plaster, which is why the frame stage is the whole argument.